As of August 2020, Current COVID-19 Realities have also been a Strain on Event Development of In Person Larger Events, and the Funding of Such Events has been challenging in the past, without such additional strains, so creativity levels must be elevated for any similar events, and it seems the "FEEL" of an event, like these, with everyone required to wear masks, or shields, defeats a lot of the joy of such events.
Please Review this blog for any updates, in the coming months, as we attempt to redesign these kinds of events. (Obviously - Limits on Crowd Sizes need to be resolved, most obviously, by the result of Daily Cases of COVID-19 Dropping to a Point of near Zero, for an extended period of time, before such realities are practical.)
Based on the Workplace Requirements currently in Place, of Mandatory Mask Wearing On Property, I can Only Expect that until such Requirements are Lifted, any thoughts or revisiting Events like these, are under an extra burden of restriction, unsuitable for Serious Event Planning.
We May Consider Different Aspects for EV Fest, as well, to allow for Various Smaller Gatherings, at some point, going forward. Some Events May, be Specifically Restricted, or not in indoor Venues or Locations, as well, to suit any remaining limits on Events.
Obviously - Ontario is appearing to do better than some areas, with this challenge, but not as good as others! We all need to do better, to starve this pandemic of targets!
A Little Extra to keep tabs on activity around EV Fest, Current Shows, Next Shows, Major Electric Vehicle News, etc!
(Reminder* - I need to Tell you this site uses Cookies! Do you Consent to using such a Site? Your continued use indicates Yes!)
Showing posts with label Permits. Show all posts
Showing posts with label Permits. Show all posts
Sunday, August 16, 2020
EV Fest Update!
Labels:
Announcement,
Canada,
Electric Vehicle Show,
EV Fest,
EV Fest Blog,
Exhibitors,
Permits,
Public Event,
Update
Sunday, June 5, 2016
Growth of Tesla Superchargers - In Ontario, Nearby, and Worldwide, since Revealing the Tesla Model 3!
At the March 31st, 2016 Reveal of the Tesla Model 3, Elon Stated the plans for a massive increase in Tesla Provided Charging Stations, by the end of 2017!
The Numbers were basically - to Double the Supercharging Stations (to 7200), and Quadruple the Destination Chargers (to 15,000)! Of course, if you drive a Tesla - you have the possibility to access all Local Public Level 2 Charging Stations, Shared J1772 and Tesla Home Chargers, NEMA 14-50 Campsite Power Plugs (And other types), and also CHAdeMO Public Charging Stations (If you have access to or have the CHAdeMO Adapter)!
As to CHAdeMO - they update their numbers periodically on the website - http://www.chademo.com/ and the latest update showed "The number of CHAdeMO DC Quick chargers installed up to today is 11291. -- (Japan 6469 Europe 3028 USA 1686 Others 108) last update 2016.04.20"
Update: The number of CHAdeMO DC Quick chargers installed up to today is 11389.
-- (Japan 6469 Europe 3028 USA 1784 Others 108) last update 2016.06.02
Also New - CHAdeMO ANNOUNCES HIGH POWER (150KW) VERSION OF THE PROTOCOL
Supercharger information can of course be found at Tesla's Page - https://www.teslamotors.com/supercharger but it can also be tracked on another, quite popular site - http://supercharge.info/ - which might differ in numbers of sites counted, but is a bit more interactive in tracking the build out with presentation of sites that are in permit state, under construction, and completed!
To see how many the http://supercharge.info/ counts as having come online, enter permit stage, or start construction, since March 31st, we click on the 'Changes' Link up at the top right of the sites page, and to see how many in each region - and in total - click the 'Charts' Link up at the top right.
Asia-Pacific Region has gone from 119 Supercharger Sites open - to 125, since March 31st, 2016. (+6)
Europe has gone from 222 Supercharger Sites open to 228 - since March 31st, 2016. (+6)
America has gone from 276 Supercharger Sites open to 283 - since March 31st, 2016. (+7)
In all - Each region has been pretty much growing at the same pace of Open Superchargers, with America leading by just 1 more than either Asia Pacific or Europe, and with 19 new sites overall, Tesla owners are seeing steady support in each of their regions, for expanding routes and increasing density in busy routes and areas! The numbers of new sites equal about 1 new site opening in each region, each 10 days as an average!
Looking at the Changes - there have been 75 new additions or updates in 59 days, or about 1.27 Supercharger Additions or updates per day since revealing the model 3! Update: + 12 items - see below.
During this time - Sites that went from Permit Stage to Construction Stage (# of Days*):
Alexandria, LA (20); Augusta, GA (1); Magog, QC (27); Miner, MO (2); and Plattsburgh, NY (18).
Sites that have gone from Construction Stage to Open (# of Days*):
Shreveport, LA (21); Reno, NV (1); Pocatello, ID (31); Magliano, Italy (1); Leonberg-Ost, Germany (2);
Hawthorne, NV (8); Grimsby, ON (23).
*These are the differences in the dates reported on Supercharger.info from one step to the next (Permit - Construction, or Construction - Open), and may not be precisely accurately reported, but are reasonable indicators of the various amounts of time between steps in the development.
This accounts for 12 sites that have changed status from permit to Construction, or from Construction to Open, but 51 others remain that have simply reported a single change from not showing - to permit, or were updated to construction, or updated to open, during this time!
There have been 12 Additional Permits issued to allow Supercharger Construction, 21 New sites that began Construction, and 18 other Sites that Opened for access!
Permits (12): West Des Moines, IA; Sweetwater, TX; Springfield, MO; Meridian, MS; Lee, MA; Landsberg, Germany; Ewingsdale, Australia; Cuernavaca, Mexico; Cisco, TX; Burgos, Spain; Bowling Green, KY; and Bay City, MI.
Construction (21): Vystrkov, Czech Republic; Tonopah, NV; Sulphur Springs, TX; Steg-Hohtenn, Switzerland; Southampton, NY; Saint-Laurent, QC; Peru, IL; Nebbenes, Norway; Murcia, Spain; Lindale, TX; Laurel, MD; Katowice, Poland; Idaho Falls, ID; Harrisburg, PA; Erie, PA; Egg Harbor Township, NJ; Dugopolje, Croatia; Catoosa, OK; Buena Park, CA; Bernau, Germany; Bend, OR.
Open (18): Zarechye, Russia; Ya'an, China; West Yellowstone, MT; Wertheim, Germany; Terre Haute, IN; Temecula, CA; Suzhou - Wuzhong, China; Shijiazhuang - Healthy City, China; Sanya - Mingzhu, China; Pearl, MS; Kunshan - Qidi Park, China; Kostomłoty, Poland; Harrisburg, PA; Dongguan - Songshan Lake, China; Chengdu, China; Châteauroux, France; Champaign, IL; Beijing - Youth Road, China.
Update: Since I sat down to write this blog post - last Sunday, May 29th, 2016 - with interruptions and an injury at work slowing me down - http://supercharge.info/ has added 12 new Events - updating some from Construction to Open, from Permit to Construction, and New Permits! CHAdeMO has also updated their numbers - added in above!
New Permits: Oakdale, MN; Port Huron, MI have been added, Now in Construction Stage is Bowling Green, KY, and Now Open are: Dugopolje, Croatia; Miner, MO; Cuernavaca, Mexico; Tonopah, NV; Southampton, NY; Strasbourg, France; Bristol - M5, UK; Erie, PA; and Shanghai- Grand Gateway, China.
Of course - there is a good distance to go towards doubling the number of Superchargers, and - I don't know of a site like Supercharge.info that tracks Destination Chargers - so for that we just have to watch Tesla's page - https://www.teslamotors.com/destination-charging and observe the general action there.
The Numbers were basically - to Double the Supercharging Stations (to 7200), and Quadruple the Destination Chargers (to 15,000)! Of course, if you drive a Tesla - you have the possibility to access all Local Public Level 2 Charging Stations, Shared J1772 and Tesla Home Chargers, NEMA 14-50 Campsite Power Plugs (And other types), and also CHAdeMO Public Charging Stations (If you have access to or have the CHAdeMO Adapter)!
As to CHAdeMO - they update their numbers periodically on the website - http://www.chademo.com/ and the latest update showed "The number of CHAdeMO DC Quick chargers installed up to today is 11291. -- (Japan 6469 Europe 3028 USA 1686 Others 108) last update 2016.04.20"
Update: The number of CHAdeMO DC Quick chargers installed up to today is 11389.
-- (Japan 6469 Europe 3028 USA 1784 Others 108) last update 2016.06.02
Also New - CHAdeMO ANNOUNCES HIGH POWER (150KW) VERSION OF THE PROTOCOL
Supercharger information can of course be found at Tesla's Page - https://www.teslamotors.com/supercharger but it can also be tracked on another, quite popular site - http://supercharge.info/ - which might differ in numbers of sites counted, but is a bit more interactive in tracking the build out with presentation of sites that are in permit state, under construction, and completed!
To see how many the http://supercharge.info/ counts as having come online, enter permit stage, or start construction, since March 31st, we click on the 'Changes' Link up at the top right of the sites page, and to see how many in each region - and in total - click the 'Charts' Link up at the top right.
Asia-Pacific Region has gone from 119 Supercharger Sites open - to 125, since March 31st, 2016. (+6)
Europe has gone from 222 Supercharger Sites open to 228 - since March 31st, 2016. (+6)
America has gone from 276 Supercharger Sites open to 283 - since March 31st, 2016. (+7)
In all - Each region has been pretty much growing at the same pace of Open Superchargers, with America leading by just 1 more than either Asia Pacific or Europe, and with 19 new sites overall, Tesla owners are seeing steady support in each of their regions, for expanding routes and increasing density in busy routes and areas! The numbers of new sites equal about 1 new site opening in each region, each 10 days as an average!
Looking at the Changes - there have been 75 new additions or updates in 59 days, or about 1.27 Supercharger Additions or updates per day since revealing the model 3! Update: + 12 items - see below.
During this time - Sites that went from Permit Stage to Construction Stage (# of Days*):
Alexandria, LA (20); Augusta, GA (1); Magog, QC (27); Miner, MO (2); and Plattsburgh, NY (18).
Sites that have gone from Construction Stage to Open (# of Days*):
Shreveport, LA (21); Reno, NV (1); Pocatello, ID (31); Magliano, Italy (1); Leonberg-Ost, Germany (2);
Hawthorne, NV (8); Grimsby, ON (23).
*These are the differences in the dates reported on Supercharger.info from one step to the next (Permit - Construction, or Construction - Open), and may not be precisely accurately reported, but are reasonable indicators of the various amounts of time between steps in the development.
This accounts for 12 sites that have changed status from permit to Construction, or from Construction to Open, but 51 others remain that have simply reported a single change from not showing - to permit, or were updated to construction, or updated to open, during this time!
There have been 12 Additional Permits issued to allow Supercharger Construction, 21 New sites that began Construction, and 18 other Sites that Opened for access!
Permits (12): West Des Moines, IA; Sweetwater, TX; Springfield, MO; Meridian, MS; Lee, MA; Landsberg, Germany; Ewingsdale, Australia; Cuernavaca, Mexico; Cisco, TX; Burgos, Spain; Bowling Green, KY; and Bay City, MI.
Construction (21): Vystrkov, Czech Republic; Tonopah, NV; Sulphur Springs, TX; Steg-Hohtenn, Switzerland; Southampton, NY; Saint-Laurent, QC; Peru, IL; Nebbenes, Norway; Murcia, Spain; Lindale, TX; Laurel, MD; Katowice, Poland; Idaho Falls, ID; Harrisburg, PA; Erie, PA; Egg Harbor Township, NJ; Dugopolje, Croatia; Catoosa, OK; Buena Park, CA; Bernau, Germany; Bend, OR.
Open (18): Zarechye, Russia; Ya'an, China; West Yellowstone, MT; Wertheim, Germany; Terre Haute, IN; Temecula, CA; Suzhou - Wuzhong, China; Shijiazhuang - Healthy City, China; Sanya - Mingzhu, China; Pearl, MS; Kunshan - Qidi Park, China; Kostomłoty, Poland; Harrisburg, PA; Dongguan - Songshan Lake, China; Chengdu, China; Châteauroux, France; Champaign, IL; Beijing - Youth Road, China.
Update: Since I sat down to write this blog post - last Sunday, May 29th, 2016 - with interruptions and an injury at work slowing me down - http://supercharge.info/ has added 12 new Events - updating some from Construction to Open, from Permit to Construction, and New Permits! CHAdeMO has also updated their numbers - added in above!
New Permits: Oakdale, MN; Port Huron, MI have been added, Now in Construction Stage is Bowling Green, KY, and Now Open are: Dugopolje, Croatia; Miner, MO; Cuernavaca, Mexico; Tonopah, NV; Southampton, NY; Strasbourg, France; Bristol - M5, UK; Erie, PA; and Shanghai- Grand Gateway, China.
Of course - there is a good distance to go towards doubling the number of Superchargers, and - I don't know of a site like Supercharge.info that tracks Destination Chargers - so for that we just have to watch Tesla's page - https://www.teslamotors.com/destination-charging and observe the general action there.
![]() |
By 10:30 AM on June 5th, 2016 - here is what Supercharge.in was reporting. |
Labels:
Canada,
China,
Construction,
France,
German,
Mexico,
Norway,
Open,
Permits,
Poland,
Russia,
Spain,
Superchargers,
Tesla,
USA,
World
Subscribe to:
Posts (Atom)